Analysis of Investment Feasibility to Pedestrian Bridge in Muara Teweh - Jingah

[Full Text]

 

AUTHOR(S)

Laode Abd. Rahman, Subandiyah Azis, Bambang Wedyatadji

 

KEYWORDS

Bridge, BCR, IRR, NPV.

 

ABSTRACT

The research aimed to analyze the needs of the construction of the Crossing Bridge of Muara Teweh - Jingah. The type of the research including the applied research was research concerning the application of theory to solve certain problems. The location of this research was at the Bridge Crossing of Muara Teweh - Jingah in North Barito District. Data analysis technique was feasibility study. The result of the research showed that: (1) the construction of the Crossing Bridge of Muara Teweh - Jingah is needed to reduce the traffic density; the traffic of the daily transportation in the development area has an effort to balance the traffic volume with road capacity in order to avoid LOS decrease and increase people's prosperity level, (2) the celebration of the construction of Muara Teweh - Jingah Crossing Bridge in terms of technical and economic and cultural aspects, is stated to have fulfilled the feasibility, (3) the feasibility of bridge development in terms of economic and cultural aspects is fulfilled, because the value of BCR is greater than > 1.0 and interest rate that is applicable is equal to 12% (in 2015). Finally, the bridge construction is feasible to be implemented.

 

REFERENCES

[1] W.R. Black, “Network Autocorrelation in Transport Network and Flow Systems,” Geographical Analysis, vol. 24, no. 3, pp. 207-222, 1992.

[2] T. Litman, Evaluating Accessibility for Transportation Planning. Victoria, Canada: Victoria Transport Policy Institute, 2008.

[3] M. Al Mamun, and N.E. Lownes, “A Composite Index of Public Transit Accessibility,” Journal of Public Transportation, vol. 14, no. 2, p. 4, 2011.

[4] D. Lee, J. Park, H. Shin, Y. Choi, H. Lee, and J. Choi, “Microgrid Village Design With Renewable Energy Resources and Its Economic Feasibility Evaluation. In Transmission & Distribution Conference & Exposition: Asia and Pacific, pp. 1-4, October 2009.

[5] C. Kahraman, E. Tolga, and Z. Ulukan, “Justification of Manufacturing Technologies Using Fuzzy Benefit/Cost Ratio Analysis,” International Journal of Production Economics, vol. 66, no. 1, pp. 45-52, 2000.

[6] W.A. Belson, Validity in survey research: with special reference to the techniques of intensive interviewing and progressive modification for testing and constructing difficult or sensitive measures for use in survey research: a report , vol. 201. Gower Publishing Company, 1986.

[7] I. Linkov, A. Varghese, S. Jamil, T.P. Seager, G. Kiker, and T. Bridges, “Multi-Criteria Decision Analysis: A Framework for Structuring Remedial Decisions At Contaminated Sites,” In Comparative Risk Assessment and Environmental Decision Making, Springer, Dordrecht, pp. 15-54, 2004.

[8] P. Xie, G. Chen, H.F. Lei, and F. Wu, “Hydrological Alteration Diagnosis System,” Journal of Hydroelectric Engineering, vol. 29, no. 1, pp. 85-91, 2010.

[9] F.H. Scrivner, W.M. Moore, W.F. McFarland, and G.R. Carey, A Systems Approach to the Flexible Pavement Design Problem, 1968.