Energy Audit: A Case Study Of Electrical Machines Lab
[Full Text]
AUTHOR(S)
Rishikesh.G, Harish Kumar.M.N, Gokulakrishnan.G, Praveenkumar.M
KEYWORDS
ABSTRACT
The increase in machines lab all over Indian Engineering college’s energy consumption has been more apparent than such increases in the industrial and transportation sectors. The main objective of this project is to analysis the energy consumption of the machine’s lab in VIT. On an periodical monitoring of these energy meter daily at a particular time for one month we can able to find the power factor, active, reactive and apparent powers of that particular lab.Thus, we can able to give solutions on what basis the load can be decreased. What amount of capacitor should be placed in order to maintain the power factor and reactive power. Thus, by plotting the graph and comparing all the outputs of the above-mentioned monitoring process the total amount is calculated according to TNEB norms can also be calculated. And after placing the capacitor the amount in reduction of cost can also be calculated.
REFERENCES
[1]. Parash Goyal, B.Siva Kumar, K.Sudhakar Energy Audit: A Case Study of Energy Center And Hostel of MANIT, Bhopal. IEEE 2013
[2]. Dr.K.Umesha, Miste.Mieee (Madras Section), Energy Audit Report On a Technical Institute, (IOSR-JEEE) Volume 4, Issue 1 (Jan.Feb.2013), PP 23-37
[3]. Malkait Singh, Gurpreet Singh, Harmandeep Singh, Energy Audit: a case Study to reduce lighting cost, AJCSIT, 2012
[4]. Utilization of Electrical Power by R.K.Rajput New age international publishers
[5]. Utilization of Electrical Power by N.V.Surya Narayana.New age international publishers
[6]. Ashok S. and Rangan Banerjee, “An Optimization Mode for Industrial Load and Management”, IEEE Transactions on Power Systems Vol.16, No.4, Nov.2007.[7]
[7]. Ms.ShardhaChandrakantDeshmukh, Ms.Varsha Arjun PatilEnergy Conservation and Audit. 2013
|